Installing Laminate Flooring

Home - laminate flooring disclaimer  shopping reviews About laminate flooring

      


How to Install your Laminate Floor

Prior to installing your flooring, unwrap the flooring and leave the boxes at room temperature for three or four days. At this time, look over all of the panels to see if there are any defects because you may not make a claim for flooring that has already been laid.

Take out any carpet, as well as any of the adhesive material that was used to lay the carpet. You must level any areas that are uneven and make sure that the surface you will be covering is clean, smooth and firm.

Due to the level of moisture, laminate panels should not be installed in bathrooms, or other rooms where a high level of moisture is contained.

Even when your are installing laminate panels in rooms that do not contain a particularly high level of moisture, it is advised that you place a moisture barrier over concrete floors. This moisture barrier will guard panels against moisture that could seep from surfaces. Place a 6-mil (0.2mm) polyethylene film moisture barrier over the base surface. The edges of the polyethylene should overlap by at least 8 inches and the connection should be sealed with some type of moisture resistant self-adhesive tape. This procedure should be followed on all concrete floors, as well as other floors where condensation or moisture seepage could occur.

It is important that floors which contain radiant heat have a moisture barrier installed over the floors. Heat should be turned down to 60 degrees F one week prior to laying the flooring and the temperature should be kept under 80 degrees F at all times.

A good quality foam underlayment (a type of padding) should be installed prior to installing laminate panels. Use a self-adhesive tape to adhere the underlayment to the base surface and do not overlap. After the underlayment is in place, the laminate panels may be placed on top.

If you are using a moisture barrier, it should be installed before the underlayment. Once the moisture barrier has been installed, the underlayment may be put on top of it. If you prefer, you may use a product that contains a combination of both a moisture barrier and an underlayment. (Make sure this type of product is reliable.)

Go to page 1 2 3 4 5

 

 Resource Links

Flooring ¤ Home related ¤ Interior designs Home Improvement Remodeling

Copyright 2005 laminateflooringanswers.com. All rights reserved world wide.
All trademarks and service marks are property of their particular owners.